Case Studies
Browse real jobs completed by our IRATA-qualified team - filter by service to find work like yours.
– Lancaster
Rope Access Banner Installation
Large-format signage installed at height on student accommodation in Lancaster, using rope access where conventional access was impractical or unnecessarily costly.
– Newcastle
High-Level Window Frame Restoration
A four-coat window-frame restoration completed by rope access, using a portable deadweight anchor system where conventional anchor points were limited.
– Aberdeen
Emergency Ballast Tank Repairs
Emergency ballast tank coating repairs aboard an offshore support vessel, with a radar change-out at the top of the mast during the same mobilisation.
– Newcastle
Dual-Purpose Aviary Netting
A wildlife park needed netting that solved two problems at once: keeping its resident birds safely contained, while also stopping wild birds getting in and spreading avian flu into the collection…
– Whitley Bay
Whitley Bay Sea Wall Repointing
Storm damage along the Whitley Bay sea wall had displaced sections of pointing, letting water get in behind the brickwork, and left alone, that meant more bricks pushed out with every high tide…
– Coventry
Emergency Flashing Repairs
A concrete ledge above a busy retail shopfront had started shedding material onto the footpath below. With the area needing to stay open, a scaffold solution wasn't viable on the timescale…
– North Sea
Offshore Wind Monitoring Support
Specialist access support within a new offshore wind structure, working alongside a sensor-installation team ahead of offshore deployment.
– Liverpool
Gull Netting for Student Halls
Seasonal gull activity at a student halls block kept blocking rainwater outlets with nesting material, backing up water, causing damage, and putting rooms out of use…
– Newcastle
Tyne Bridge North Tower Maintenance
Jet washing and bird-control netting installed within the Tyne Bridge North Tower using rope access to reach difficult internal areas.